Thames Gateway Phase 3. Oct 2014 - April 2015

Thames Gateway Phase 3

Site Size 60,000 m2 Construction of 9 Industrial Units

Total Value of project £1.6m

Works consists of all drainage works

All formwork & steel fixing

Cut and trimmed pile caps to suit

Construct ground beams

Concrete bases for sub station

All site concrete walls and foundation works

Prep ground for internal concreting, all internal concrete finished with power float


Connection to main Thames water sewer etc,