Archive for the 'Projects' Category

Project Croydon

Posted on July 25th, 2015 · Posted in Projects

Construction of 7 flats over 4 floors as per client specifications. G8 construction had input in the design and build.

53494pllywdyclzk0xab

AMPS Programme at Thames Water STW Works

Posted on January 22nd, 2015 · Posted in Projects

Currently we are carrying out works at Becton, Essex for GBMJV. This project started in 2010. We carry out all the reinforced concrete works, excavations, building pits, some demolition works.. read more

The Shard

Water Supply to Shard

Posted on January 22nd, 2015 · Posted in Projects

Re-lining 36” Diameter Mains. Thomas Street, leading up to The Shard, was excavated by MGJV to uncover the existing water main and sheet piles to support the excavations. Water main.. read more

and

The Medway Towns Gurdwara

Posted on January 22nd, 2015 · Posted in Projects

This project of constructing a temple, our place of worship, was an exciting, unique and pleasurable experience for all members at G8. Having purchased the factory from Telspec on 14th.. read more